| PROGRAMME 2003 |
 |
| Morning: 9.00 a.m. |
| |
Introduction to the problems related with asbestos.
The Index solutions and alternative systems.
|
| |
Methods for refurbishing asbestos-cement roofing:
The Index solutions and alternative systems. |
| |
- Removal
- Encapsulation
- Overcovering |
| |
The execution of detailed parts |
| |
- The sloping ridge and the perimiter profiles when overcovering with Isolondula |
| |
The general rules and regulations in force
(Presidential Decree D.P.R. 547/55 - Presidential Decree D.P.R. 303/56 - Presidential Decree D.P.R. 164/56 - Legistlative Decree 475/92 Legistlative Decree 626/94 and following - Legistlative Decree 494/96 and following)
The specific rules and regulations in force
(Legistlative Decree 277/91 - Legistlative Decree 257/92. Ministerial Decree 06/09/94))
The decree of the Minister of Health dated 20/08/99 enclosure 2 |
| |
- Steps for safety and the prevention of accidents
- How to assess the superficial deterioration of the roofing (the Standard Uni 10608/97)
- Practical cases: ordinances and prescriptions.
|
| |
P.O.S.A. 3 |
| |
- Drawing up a correct Operational Safety Plan (POS) when refurbishing asbestos cement. |
12.30 - 14.00 p.m.: Working lunch
Afternoon 14.00 p.m.
|
| |
The correct use of the products in the various typologies of intervention |
| |
- Examples of practical application
|
| |
Drawing up the specifications with the Projectflux Installers Cd-Rom |
| |
Presentation of the Internet web site |
17.30 p.m
- Presentation of the course participation certificates
- End of work |