| PROGRAMME 2003 |
 |
| Morning: 9.00 a.m. |
| |
Consolidating and finishing damp masonry |
| |
- The typology of humidity in constructions
- The cause of deterioration: physical, chemical and biological
- The analysis of the existing tecniques for consolidation
-proofing macro-porous plasters. Cycles of intervention and specific rules and regulations
- Transpiring finishes |
| |
Waterproofing underground rooms and sunken concrete tanks |
| |
- The cause of infiltrations and the action of water on underground rooms
- Cycles of intervention: quick-setting and osmotic cements
- Containment in tanks and basins for drinking water and other water
- Cycles of intervention: osmotic cements, elastic coatings and epoxy paints |
| |
Repairing concrete |
| |
- The cause of deterioration: chemical, physical and mechanical
- Assessing the support:, the carbonation of the cement matrix and the degree of oxidisation of the reinforcement
- Protecting the reinforcement: cement and epoxy passivating products
- Repairing the concrete layer: thixotropic and pourable mortars
- Protecting the structures: waterproofing, elastic smoothing finishes and anti-carbonation paints |
| |
Guide to the field of use for Index products |
| |
- Drawing up a correct Operational Safety Plan (POS) when refurbishing asbestos cement.
|
12.30 - 14.00 p.m.: Working lunch
Afternoon 14.00 p.m.
|
| |
Practical installation demonstrations and tests |
| |
Presentation of the Internet web site |
17.30 p.m.
- Presentation of the course participation certificates
- End of work |